Westfield Newmarket
277 Broadway Newmarket 2013
277 Broadway Westfield, Newmarket is a construction project that involved Party Wall Installation, specifically the installation of 1.15BMT Steel Stud and Plasterboard Fixing. This installation provided benefits such as improved sound insulation, increased fire resistance, and enhanced structural stability. The project team ensured compliance with local building codes and regulations, and the use of high-quality materials resulted in a more efficient construction process. The successful completion of this installation serves as an example of using advanced building materials and
Read MoreNew World Mangawahi
83 Molesworth Drive Mangawhai 0505
Mangawhai New World is a construction project that involved Dry Packing, Sealant Works, Concrete Forming and Patching, Suspended Ceiling, Smoke Seal, and Passive Fire installations. These installations were completed to high quality and safety standards, and involved the use of advanced materials and techniques. Dry Packing, Sealant Works, Concrete Forming and Patching, Suspended Ceiling, Smoke Seal, and Passive Fire installations provided numerous benefits to the project, including enhanced fire resistance, improved structural integrity, and enhanced energy efficiency. The project team worked
Read MoreBunnings Mangawhai
83 Molesworth Drive Mangawhai 0505
Koel Construction completed a construction project at Mangawhai Bunnings that involved several different types of work. Dry Packing was done to provide structural stability, while Sealant Works were completed to seal joints and gaps. Concrete Forming and Patching was done to repair and smooth surfaces. General Painting, Marine Painting, and Intumescent Painting were also done to improve the appearance and durability of surfaces. Plasterboard Fixing and Stopping were done to provide smooth finishes to walls and ceilings. Overall, Koel Construction
Read MoreHuapai Country Club
23 Vintry Drive Huapai 0810
Huapai Country Club Stage One is a construction project in Huapai that used Dincel wall and framing systems. These systems are advanced building materials that provide strength, durability, and sustainability. The installation was completed to high standards and provided benefits such as improved construction speed and efficiency, reduced material waste, and enhanced energy efficiency. The project is a model for future construction projects looking to maximize efficiency, sustainability, and quality.
Read MoreRetail Shops Mangawahi
83 Molesworth Drive Mangawhai 0505
Koel Construction completed the Mangawhai Retail Shop Stage One project, which involved a variety of construction work. The work included Dry Packing, Sealant Works, Concrete Forming and Patching, Timber Framing, Steel Framing (1.15BMT), Plasterboard Fixing and Stopping, and Passive Fire installations. The project team worked closely with the client to ensure all specifications and requirements were met, and used high-quality materials and advanced techniques to deliver a durable, safe, and efficient building. Overall, the successful completion of the Mangawhai
Read MorePavilion Hotel Auckland Airport
Auckland Airport
Koel Construction completed the Pavilion Hotel project in Mangere, which involved Fibre Cement Cladding, Decking, and Finishing Works. The project team faced several obstacles, including tight timeframes, shortages of materials, and incorrect drawings. Despite these challenges, the team worked diligently to complete the project to the highest standards, using advanced techniques and high-quality materials to ensure that the building was structurally sound and aesthetically pleasing. The successful completion of the Pavilion Hotel project demonstrates Koel Construction's ability to overcome
Read MoreWalker Terraces
Walker Terraces
Koel Construction completed the Walker Terrace project in Point Chevalier, which involved Timber Framing, Truss, and Strapping. The project team encountered several obstacles, including incorrect frames, unleveled slabs, poor project management, and the need to reconfigure frames on the spot. Despite these challenges, the team worked hard to complete the project to the required standards, using advanced techniques and materials to ensure that the building was structurally sound and safe. The successful completion of the Walker Terrace project demonstrates
Read MoreResidential Maintenance
Residential Maintenance
Maintaining Residential homes for Kianga Ora, (Housing NZ) Contracted by SpotlessOverall, the use of advanced materials and techniques has resulted in a construction project that is durable, reliable, and aesthetically pleasing.
Read More